Sailvan S-Curved Chenille Sofa Loveseat, Dual-Depth, No Assembly, Compact for Small Spaces

★★★★★ 4.7 117 reviews

US$136.00
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by koutev-architecture.fr
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$136.00
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Oct 9
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by koutev-architecture.fr
Free 30-day returns Details

Product details

Management number 252362336 Release Date 2026/10/01 List Price US$136.00 Model Number 252362336
Category

Sailvan S-Curved Chenille Sofa Loveseat features dual-depth (21.3" & 26.8") design, inspired by Tai Chi to embody Yin-Yang balance. Crafted with luxurious woodgrain-textured chenille fabric and 30D full compression sponge, it offers exceptional softness and durability. Compact 66.9" L profile fits small apartments, offices, meditation rooms, and cafe corners perfectly. No assembly required—unpack and use effortlessly. With 400 lbs weight capacity, 2 coordinating throw pillows (for applicable styles), and versatile solo/paired use, it blends comfort, style, and convenience for modern living.

  • Tai Chi Inspired Design: S-curved shape embodies Yin-Yang balance; pair two sofas to form a harmonious circle, suitable for solo or paired versatile use.
  • - Dual-Depth & Ergonomic Support: 21.3" & 26.8" dual seat depth with 30D compression sponge, 400 lbs weight capacity for stable, comfortable daily use.
  • - Luxurious Chenille Fabric: Woodgrain-textured chenille upholstery delivers soft touch and durable elegance, fitting various decor styles.
  • - No Assembly & Compressed Design: Unpack and decompress effortlessly, ready to use in seconds, saving time and effort.
  • - Space-Saving & Versatile: Compact 66.9" L profile fits small spaces like apartments, offices, meditation rooms without sacrificing style.
Color White
Seating capacity 3
Dimensions 66.90 x 40.20 x 25.60 in
Fabric material name Chenille
Fill material foam
Sofa & loveseat design Recamier
Assembly req N
Max load 1000 lb
Seat depth 66.9 in
Seat height 25.6 in
Seat width 40.2 in
Decor style Modern
Brand Sailvan
Pattern Woodgrain
Seat back height 25.6 in
Assembled product weight 51.9 lb
Age group Adult
Total count 1
Upholstered Y
Suggested number of people for assembly 1
Items included 2 Coordinating throw pillows
Has written warranty No

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.7 out of 5
★★★★★
117 ratings | 48 reviews
How item rating is calculated
View all reviews
5 stars
86% (101)
4 stars
2% (2)
3 stars
1% (1)
2 stars
1% (1)
1 star
10% (12)
Sort by

There are currently no written reviews for this product.